Form Center

By signing in or creating an account, some fields will auto-populate with your information and your submitted forms will be saved and accessible to you.

Construction Meter Relocation

  1. TERMS OF USE:
    • The meter will have all fittings and equipment attached and unaltered and locked to a fire hydrant at all times.
    • Meter staff will read the meter the first week of each month; billing will follow accordingly.
    • Failure to comply will result in immediate forfeiture of the deposit and meter.
    • Damage to the meter and its components will be assessed at current replacement costs.
    • PLEASE TAKE NECESSARY PRECAUTIONS TO PROTECT, ESPECIALLY DURING EXTREME TEMPERATURES
    • Email ContactWaterBilling@McKinneyTexas.org to relocate* or schedule pick-up of the meter.
    • Pre-Paid Deposit: $1,765.00
  2. MONTHLY CHARGES
    Fees Inside City Limits Outside City Limits
    Base Fee $122.45 $143.65
    Usage Fee $30.00 $30.00
    Consumption per 1,000 gallons $4.65 $5.45
  3. ONE TIME FEES
    One-time Charges (if applicable) Fee
    Tampering Fee $50.00
    Damaged Collar Lock $50.00
    Removal for non-payment $40.00
    *Relocation Fee $40.00
  4. Flagging tape is available in our office. If hydrant cannot be identified, a City of McKinney technician must be able to reach site contact before meter will be relocated.
  5. Terms of Use Acceptance*
  6. Leave This Blank:

  7. This field is not part of the form submission.